扒下小内裤打屁股,久久无人区卡三卡4卡,蜜臀av无码人妻精品,极品少妇被猛得白浆直流草莓视频

文章詳情

i1000d U9401

日期:2025-04-04 02:04
瀏覽次數(shù):2137
摘要:

i1000d U9401
Before you begin installation, prepare the power cable for the system.
Refer to the instructions
incontinue with the installation procedure for your system:
. Installation Procedure for Press Down Model (U940IA)
~ Installation procedure for Vacuum Model (U9402A)
Installation Procedure for Press Down Model (U940IA)
1  Install the Press Down Unit (U940IA)
2  Install the Controller
3  Connect the Debug Probe
4 Connect Power and Compressed Air Supply
5 Power Up the System
6  Install Medalist il000 Software
7  Install the Fixture
8 Align the Safety Sensors
9  Perform a System Check
Installation procedure for Vacuum Model (U9402A)
1  Install the Controller
2 Connect the Debug Probe
3 Connect Power and Compressed Air Supply
4 Power Up the System
5  Install Medalist il000 Software
6  Install the Fixture
7  Perform a System Check
Medallist  i1000  InStalia~tion  Guzde
Preparing the Power Cord

The Medalist il000 is shipped without a power cord. This allows local support
engineers to purchase a power cord that is suitable for use in the facility
where the system is installed and meets the regulatory requirements of the
country.
Be sure to purchase a power cord rated to operate at 200~240 VAC and
10 Amps, with a minimum length of 2.5 m.
To assemble the power cord, follow these steps:
1    Locate  the  power  connector  provided fFigur e  8)
Figure 8   Power connector
2 Loosen the two screws holding the cable retainer at the back of the
   power connector. Then unscrew the black connector insert to separate
    it from the metal casing(fg_:-o :-.).
Figure 9   Remove black connector insert
Medealist i1000  Instaallation  G uidp
3 Strip the insulation
power cord through
(Figure 10).
of the power cord to expose the wires. Insert the
the metal casing of the power connector
Figure 10   Strip power cord and insert in connector
4  Solder the wires to the correct terminals on the connector insert. The
   terminals are  numbered as  shown in "Fi;-:-1■.re  1 11-.
Ensure the wires are connected to the correct terminals as shown in
            .. Otherwise the system could be damaged.
Figure 11   Solder wires to terminals
Me d allist  il 000  InStaliation  Guade
i1000d U9401
 

南投县| 宝山区| 神木县| 临邑县| 包头市| 伊宁市| 华池县| 桐乡市| 仁布县| 金昌市| 邹城市| 土默特右旗| 大方县| 丹棱县| 安远县| 湖南省| 佛学| 枣庄市| 佛坪县| 阜康市| 长乐市| 都匀市| 洛南县| 嘉鱼县| 凤台县| 玛纳斯县| 渝中区| 宜昌市| 呼图壁县| 当阳市| 谢通门县| 武穴市| 天水市| 凭祥市| 平果县| 朔州市| 丹凤县| 阿瓦提县| 古蔺县| 汝州市| 平和县|